How does your jacket development and production process work?

Projects start with an inquiry and brief where requirements, budget and timeline are aligned. We then confirm fabrics and trims, finalize tech packs and patterns, and move into sampling, which typically takes 7–10 days once details are locked. After pre-production confirmation of POs, colors, sizes and timing, bulk cutting, sewing and finishing follow the approved reference. QC and packing include inline and final AQL checks, correct labels/tags and carton setup before shipping and replenishment planning.