At Vanrd, the timeline breaks into clear phases: fabric sourcing and washing specification (5-10 days), sample development (7-15 days), fit approval (2-5 days), bulk cutting and sewing (20-35 days), washery and finishing (5-10 days), and final QC inspection (2-3 days). Sea freight adds 15-30 days, while air freight takes 5-10 days. Rush sample service is available in 5-7 days for an additional charge.
Select denim weight (10-14 oz), wash type (stone, enzyme, acid), and custom hardware
Pattern making, sample cutting, sewing, and first fit review
Client reviews fit sample, requests adjustments if needed
Graded pattern marking, bulk fabric cutting, assembly line sewing
Denim washing, drying, pressing, and final finishing touches
AQL 2.5 inspection, size set measurement, tagging, and packing
Denim jacket sample at Vanrd's development studio
Denim wash samples and fabric selection
Skilled sewing operators in Vanrd's production linesClient: Canadian streetwear label launching a capsule collection of 200 custom denim jackets with custom enzyme wash and branded hardware.
Timeline with Vanrd:
Result: Jackets arrived in time for the brand's seasonal launch event. Wholesale pre-orders exceeded projections by 40%.
| Production Stage | Standard Jacket | Denim Jacket | Difference |
|---|---|---|---|
| Fabric Sourcing | 3-7 days | 5-10 days | +2-3 days |
| Sample Development | 7-10 days | 7-15 days | +0-5 days |
| Bulk Production | 20-30 days | 25-40 days | +5-10 days |
| Total Factory Time | 30-47 days | 37-65 days | +7-18 days |
Specialty washes like acid wash or distressed finishes require multiple trials, adding 5-15 days.
Custom buttons and rivets with brand engraving need 10-20 days lead time from suppliers.
Days avg bulk apparel lead time from China (industry-wide)
Days Vanrd denim jacket lead time
On-time delivery rate at Vanrd
Planning a custom denim jacket collection? Contact Vanrd to discuss your timeline.