The typical lead time for custom apparel manufacturing from China ranges from 7 to 15 days for sampling and 30 to 50 days for bulk production from sample approval. Shipping costs depend on weight, volume, destination, and method. Sea freight to the US and Europe averages $3–$8 per kg, while air freight ranges from $8–$20 per kg.
| Stage | Duration | Notes |
|---|---|---|
| Fabric sourcing | 5–15 days | Stock fabric faster; custom mills longer |
| Sample development | 7–15 days | Pattern, fit sample, and approval |
| Bulk production | 30–50 days | Cutting, sewing, QC, and packing |
| Sea freight (US) | 20–30 days | Port-to-port plus customs |
| Sea freight (Europe) | 25–35 days | Varies by port of entry |
| Air freight (US/EU) | 5–10 days | Door-to-door with customs |
VANRD provides production timeline estimates and shipping guidance for each order. Contact the team for a detailed schedule.